Selection topics
Work through the decisions that change the machine
Capacity & flow
Specify the operating range the machine must handle, rather than selecting a unit from tank volume alone.
Viscosity & particles
Product data determines how the liquid spreads, releases gas and passes through the discharge path.
Oxygen target & testing
Name the result, the measurement point and the method before comparing equipment performance.
Vacuum & temperature
Review pressure and temperature as a pair, together with the product and the vapour-handling scope.
Cleaning & CIP
Include every product-contact component in the cleaning review, from distribution to the discharge pump.
Installation & utilities
A line sketch, connection schedule and available services turn an equipment enquiry into a practical installation review.
Readiness check
Complete what you know; expose what you do not
This checklist runs only in your browser. It does not transmit project data.
Local worksheet · no upload · no account
Start with the product and flow range.
Local worksheet
Configuration input checklist
Acceptance plan
Write the test before writing the guarantee
An acceptance statement needs a product condition, operating point, instrument, sampling method and measurement location.
Quotation package
Ask the proposal to expose its boundaries
Process basis
Duty, assumptions, exclusions and acceptance test.
Equipment scope
Vessel, distributor, pumps, condenser, valves and instruments.
Interfaces
Connections, utilities, controls, layout and installation boundary.
Evidence
Drawings, material documents, FAT scope, manuals and certificates actually supplied.
Turn process data into a configuration
Discuss the machine and your process.
Tell us which product you process and what the deaerator needs to connect to. Technical values can follow during the configuration review.